Installed HVAC, plumbing, and fire protection in Time Warner Cable's offices in June 2001. In September 2011, recommissioned HVAC equipment and installed a comfort network system for better energy savings. In December 2012, Grunau prefabricated piping to efficiently install a new chiller system on the roof.
Grunau Location: Wisconsin Office
Owner: Wisconsin Electric
Contractor: GPD/Gilbane
Architect: Eppstein Uhen
Engineer: Grunau Company
Completed: December 2012